Odom #8 Woodbine

BOPD = Barrels of oil per day; MCF = Thousand cubic feet of natural gas also the standard unit for gas sales; MCFPD = Thousand cubic feet of natural gas per day . Glossary.

Sorted by Well Name

Woodville 2006-2 Drilling Program and Wells

8/11/2008 For the month of June, the well produced 2995 Barrels of Oil.

7/17/2008 For the Month of May, the well produced 3,220 Barrels of Oil.

6/4/2008 For the month of April, the well produced 3,107 Barrels of Oil.

5/12/2008 MPI is only providing monthly totals, so we are unable to post daily averages, as we have previously.

For the month of March, the well produced 3,172 Barrels of Oil.

For the month of February, the well produced 3,088 Barrels of Oil.

2/24/2008 For the month of January, the well averaged 94.54 BOPD.

1/23/2008 For the month of December, the well averaged 67 BOPD.

12/26/2007For the month of November, the well averaged 85 BOPD.

12/10/2007 For the month of October, the well averaged 101.48 BOPD.

11/2/2007 For the month of September, the well averaged 115 BOPD.

9/25/2007 For the month of August, the well averaged 117.91 BOPD.

8/21/2007 For the month of July, the well averaged 123.25 BOPD.

7/19/2007 For the month of June, The well was offline for 3 days. The well averaged 114.09 BOPD and 27 BOWPD.

6/19/2007 The well started production on June 1st. It is producing approximately 200 barrels of fluid about half of which is water. The oil should come up and the water levels will go down over time. This should begin paying in August.

6/01/2007 The well was fracced May 24th. We are waiting for results.

5/12/2007 The well is scheduled to be fracced the week of May 23rd.

4/27/07 Drilling completed. Wellbore being prepared for Packers Plus system to be followed by frac treatment.

4/04/07  Drilling began on 3/26/07.  As of 4/03/07, drilling at 7,213’.

3/23/07   Scheduled to be spudded next week.