Fickey #2-H Georgetown-BudaBOPD = Barrels of oil per day; MCF = Thousand cubic feet of natural gas also the standard unit for gas sales; MCFPD = Thousand cubic feet of natural gas per day . Glossary. Brazos Valley 2006-2 Drilling Program and Wells 8/11/2008 For the month of June, the well produced 30 Barrels of Oil. 7/17/2008 For the Month of May, the well produced 243 Barrels of Oil. 6/4/2008 For the month of April the well produced 124 Barrels of Oil. 5/12/2008 MPI is only providing monthly totals, so we are unable to post daily averages, as we have previously. For the month of March, the well produced 173 Barrels of Oil. For the month of Februaury, the well produced 171 Barrels of Oil. 2/24/2008 For the month of January, the well produced a total of 162 Barrels of Oil. 1/23/2008 For the month of December, the well produced a total of 193 Barrels of Oil. 12/26/2007 For the month of November, the well produced a total of 246 Barrels of Oil. Martineau Petroleum is evaluating the options of a workover or redrilling the the pugged lateral for this well. 12/10/2007 For the month of October, the well produced a total of 219 Barrels of Oil. 11/2/2007 For the month of September, the well produced a total of 273 Barrels of Oil. 9/25/2007 For the month of August, the well averaged 10.79 BOPD and 26.48 MCFPD. 8/21/2007 For the month of July, the well averaged 9.99 BOPD and 47.25 MCFPD. 7/17/2007 For the month of June, the well averaged 11.2 BOPD and 53.43 MCFPD. 6/28/2007 For the month of May, the well averaged 15 BOPD. 5/04/2007 For the month of April, the well was online for 29 days and averaged 19.29 BOPD and 12.14MCFPD. For the month of March, the well averaged 37.31 BOPD and 16.48 MCFPD. 4/04/2007 For the 24 days of February the well was on line, the well averaged 112 BOPD and 62 MCFPD 3/23/2007 Averaging 43 BOPD 3/16/2007 Workover rig onsite for maintenance 3/05/2007 Mud acid treatment applied to remove drilling mud from wellbore. Well shut in permit acid treatment to do its job. 2/20/2007 Averaging 145 BOPD and 108 Mcfpd for the month. 300 barrels of drilling mud remain in the Buda lateral, restricting flow. If it does not clear up on its own, we will initiate efforts to remove. 2/13/2007 Production is averaging 174 BOPD and 100,000 cubic feet of natural gas per day. 1/30/2007 Drilling complete--preparing site for production 1/19/2007 Drilling lateral out 3,167’. We have had similar shows and flares as when we drilled the Fickey #1H. 1/12/2007 Drilling lateral out 2,552’ 1/04/2007 Drilling at 8900’ 12/20/2006 Well spudded
Copyright B&R Energy LLC |