Shepherd Creek WoodbineBOPD = Barrels of oil per day; MCF = Thousand cubic feet of natural gas also the standard unit for gas sales; MCFPD = Thousand cubic feet of natural gas per day . Glossary. Brazos Valley 2006-1 Drilling Program and Wells 8/11/2008 For the month of June, the well produced 1,726 Barrels of Oil. 7/17/2008 For the Month of May, the well produced 1,954 Barrels of Oil. 6/4/2008 For the month of April, the well produced 2,009 Barrels of Oil. 5/12/2008 MPI is only providing monthly totals, so we are unable to post daily averages, as we have previously. For the month of March, the well produced 2,321 Barrels of Oil. For the month of February, the well produced 2,273 Barrels of Oil. 2/24/2008 For the month of January, the well averaged 73.80 BOPD. 1/23/2008 For the month of December, the well averaged 77.90 BOPD. 12/26/2007 For the month of November, the well averaged 79.30 BOPD. 12/10/2007 For the month of October, the well averaged 85.51 BOPD. 11/2/2007 For the month of September, the well averaged 95.63 BOPD. 9/25/2007 For the month of August, the well averaged 104.41 BOPD. 8/21/2007 For the month of July, the well averaged 109.06 BOPD. 7/17/2007 For the month of June, the well averaged 131.47 BOPD. 6/28/2007 For the month of May, the well averaged 149.03 BOPD. 5/4/2007 For the month of April the well averaged 177.15 BOPD. 4/04/2007 For the month of February, the well averaged 239.4 BOPD 2/20/2007 For the month of January, averaged 150 BOPD. 1/19/2007 For the month of December, averaged 144 BOPD 12/12/06 For the month of November, averaged 156 BOPD 11/08/2006 Last 21 days of month of October, average 180 BOPD. 10/26/2006 Currently flowing at a rate of 180 BOPD. 10/17/2006 Currently flowing at a rate of 180 BOPD. 10/10/2006 Frac successfully completed, currently flowing at a rate of 130 BOPD and 253 barrel of water. 9/26/2006 Drilling lateral completed. Frac scheduled for Monday (October 2) 9/19/2006 Drilling lateral out to 3,409' 9/15/2006 Drilling lateral out to 3,092' 9/06/2006 Production casing set in curve at 8,642' and preparing to drill the lateral. 8/30/2006 Building curve. Currently at 8,433' 8/22/2006 Drilling 8,026' 11/08/2006 Last 21 days of month of October, average 180 BOPD. 10/26/2006 Currently flowing at a rate of 180 BOPD. 10/17/2006 Currently flowing at a rate of 180 BOPD. 10/10/2006 Frac successfully completed, currently flowing at a rate of 130 BOPD and 253 barrel of water. 9/26/2006 Drilling lateral completed. Frac scheduled for Monday (October 2) 9/19/2006 Drilling lateral out to 3,409' 9/15/2006 Drilling lateral out to 3,092' 9/06/2006 Production casing set in curve at 8,642' and preparing to drill the lateral. 8/30/2006 Building curve. Currently at 8,433' 8/22/2006 Drilling 8,026'
Copyright B&R Energy LLC |