Odom #6 WoodbineBOPD = Barrels of oil per day; MCF = Thousand cubic feet of natural gas also the standard unit for gas sales; MCFPD = Thousand cubic feet of natural gas per day . Glossary. 2005 Brazos Valley 4 Well Drilling Program and Wells 8/11/2008 For the month of June, the well produced 1299 Barrels of Oil. 7/17/2008 For the Month of May, the well produced 1,409 Barrels of Oil. 6/4/2008 For the month of April, the well produced 1,907 Barrels of Oil. 5/12/2008 MPI is only providing monthly totals, so we are unable to post daily averages, as we have previously. For the month of March, the well produced 1,440 Barrels f Oil. For the month of February, the well produced, 1,214 Barrels of Oil. 2/24/2008 For the month of January, the well averaged 53.03 BOPD. 1/23/2008 For the month of December, the well averaged 59.93 BOPD. 12/26/2007 For the month of November, the well averaged 54.80 BOPD. 12/10/2007 For the month of October, the well averaged 63.26 BOPD. 11/2/2007 For the month of September, the well was online for 17.5 days averaging 95.48 BOPD. 9/25/2007 The workover has been completed. The Martineau Team is pleased with the results, the last 2 days of production were 105 BOPD (9/24/07) and 108 BOPD (9/23/07). 8/21/2007 For the month of July, the well was offline all month, waiting for a workover. 7/19/2007 For the month of June, the well was online for 2 days producing a total of 68.51 Barrels of Oil and 53 Barrels of Water. 6/28/2007 For the month of May, the well averaged 139.6 BOPD for the 25 days it was online. 5/04/2007 For the month of April the well averaged 157.76 BOPD and 49.16 BWPD. For the month of March the well was online 12 days and averaged 31.04 BOPD. The well was offline to put on a pump. 4/04/2007 For the month of February, the was off line for 5 days, and for the remaining 23 days of the month, the well averaged 94.5 BOPD 2/20/2007 For the month of January, averaged 87 BOPD. 1/19/2007 For the month of December, averaged 90 BOPD 12/12/2006 Producing 90 barrels of oil and 40 barrels of frac water. 12/07/2006 Producing 92 barrels of oil and 50 barrels of water. 11/29/2006 Well went on production on November 26th. Currently, it is producing 60 barrels of oil and 52 barrels of water. 11/08/2006 Total depth (TD) reached. Fracture treatment (Frac) scheduled for November 22. 11/01/2006 Drilling lateral out 2,796'. Work was delayed a couple of days due to flooding. 10/26/2006 Drilling lateral out 2,080' 10/17/2006 Building curve. Currently drilling at 8,661' 10/10/2006 After resuming operations on 9/29/2006, drilling at 7,819' 3/29/2006 Well bore initiated and surface casing set.
Copyright B&R Energy LLC |