Lenz WoodbineBOPD = Barrels of oil per day; MCF = Thousand cubic feet of natural gas also the standard unit for gas sales; MCFPD = Thousand cubic feet of natural gas per day . Glossary. 2005 Brazos Valley 4 Well Drilling Program and Wells 8/11/2008 For the month of June, the well produced 864 Barrels of Oil. 7/17/2008 For the Month of May, the well produced 951 Barrels of Oil. 6/4/2008 For the month of April, the well produced 880 Barrels of Oil. 5/12/2008 MPI is only providing monthly totals, so we are unable to post daily averages, as we have previously. For the month of March, the well produced 1,002 Barrels of Oil. For the month of February, the well produced 587 Barrels of Oil. 2/24/2008 For the month of January, the well averaged 35.35 BOPD. 1/23/2008 For the month of December, the well averaged 35.64 BOPD. 12/26/2007 For the month of November, the well averaged 38.46 BOPD. 12/10/2007 For the month of October, the well averaged 39.35 BOPD. 11/2/200 For the month of September, the well averaged 40.83 BOPD. 9/25/2007 For the month of August, the well averaged 43.70 BOPD. 8/21/2007 For the month of July, the well averaged 45.29 BOPD. 7/17/2007 For the month of June, the well averaged 47.7 BOPD. 6/28/2007 For the Month of May, the well averaged 49.7 BOPD. 5/4/2007 For the month of April the well averaged 52BOPD. 4/04/2007 For the month of February, the well averaged 66.5 BOPD 2/20/2007 For the month of January, averaged 75 BOPD. 1/19/2007 For the month of December, averaged 54 BOPD. A workover rig was brought in and, thus far for the month of January, it is averaging 80 BOPD. 12/12/2006 For the month of November, averaged 72 BOPD 11/08/2006 For the month of October, averaged 91 BOPD 10/10/2006 For the month of September, averaged 100 BOPD 9/06/2006 For the month of August, averaged 106 BOPD 8/22/2006 Flowing 106 BOPD 8/15/2006 Producing over 100 barrels of oil per day. 7/31/2006 Producing approximately 160 barrels of fluids; primarily recovering frac fluids. Producing fluid will gradually convert to oil as frac fluids are recovered. 7/18/2006 Fracture treatment under way this morning. 7/7/2006 Finished drilling lateral at about 5,000'. pulling out of hole to insert liner. Frac scheduled for 7/17. 7/6/2006 Drilling lateral at about 3,250'. Expect to TD sometime Thursday. 6/27/2006 Drilling 2nd sidetrack lateral at about 2000' 6/12/2006 Finished drilling curve at 8,721'. Will set casing through curve tomorrow. 6/7/2006 Unable to unstick pipe. Backed off drill pipe at 8,206', preparing to set cement plug and then sidetrack at 7955'. Expect to be back drilling curve by mid day 6/8. 6/5/2006 Drill pipe stuck at 8,808' while drilling curve. Working to unstick pipe. 5/30/2006 Milling window at 7789-7797. 5/25/2006 Drilling rig in process of rigging up to set whipstock, cut window and initiate drilling curve. Copyright B&R Energy LLC |