Fickey #1-H Georgetown/Buda

BOPD = Barrels of oil per day; MCF = Thousand cubic feet of natural gas also the standard unit for gas sales; MCFPD = Thousand cubic feet of natural gas per day . Glossary.

Sorted by Well Name

2005 Brazos Valley 4 Well Drilling Program and Wells

8/11/2008 For the month of June, the well produced 718 Barrels of Oil.

7/17/2008 For the Month of May, the well produced 63 MCF and 851 Barrels of Oil.

6/4/2008 For the month of April, the well produced 284 MCF and 880 Barrels of Oil.

5/12/2008 MPI is only providing monthly totals, so we are unable to post daily averages, as we have previously.

For the month of March, the well produced 264 MCF and 974 Barrels of Oil.

For the month of February, the well produced 278 MCF and 899 Barrels of Oil.

2/24/2008 For the month of January, the well averaged 27.87 BOPD and a total of 221 MCF.

1/23/2008 For the month of December, the well averaged 30.09 BOPD and a total of 209 MCF.

12/26/2007 For the month of November, the well averaged 32.60 BOPD.

12/10/2007 For the month of October, the well averaged 35.12 BOPD.

11/2/2007 For the month of September, the well averaged 38.67 BOPD.

9/25/2007 For the month of August, the well averaged 35.78 BOPD and 33.77 MCFPD.

8/21/2007 For the month of July, the well averaged 39.45 BOPD and 45.42 MCFPD.

7/17/2007 For the month of June, the well averaged 30 BOPD and 48 MCFPD.

6/28/2007 For the month of May, averaged 44 BOPD.

5/04/2007 For the month of April the well averaged 49.86 BOPD and 43 MCFPD.

For the month of March the well averaged 56.66 BOPD and 49 MCFPD.

4/04/2007  For the month of February, the well averaged 60.25 BOPD and 41 MCFD

2/20/2007  For the January, averaged 66 BOPD and 55 Mcfpd.

1/19/2007 For the month of December, averaged 76 BOPD and 64 Mcfpd

12/12/06 For the month of November, averaged 95 BOPD and 104 Mcfpd

11/08/2006 For the month of October, average production 123 BOPD and 136 MCFPD

10/10/2006 For the month of September, Average production 161 BOPD and 186 MCFPD.

9/06/2006 For the month of August, average production averaged 237 BOPD and 308 MCFPD. The first two months of production paid for its proportational part of the programs cost. This production rate pattern is consistent with expectations.

7/26/2006 Oil 552 BOPD Gas, 744 Mcfpd  

6/27/2006  Oil 742 BOPD  Gas 1,048 Mcfpd

6/14/2006  Pipeline connected and well put on line.  Producing at a rate of 850-900 BOPD and 1 million CF gas per day at 890# flowing tubing pressure.

6/12/2006  Finishing laying pipeline for gas sales.  Expect to be ready to sell gas by late Tuesday. 

6/5/2006  Preliminary testing of the well indicated a flow rate of 500-600 barrels per day (mixture of oil, mud and water)  with and estimated 600-800 MCFPD gas.

5/30/2006 Workover rig scheduled for Thursday.  Tank battery to be installed on Friday.  Pipeline scheduled for completion 6/7-6/10.  Estimated on line by 6/10.

5/23/2006  Completed drilling of laterals.  In process of equipping  well for production.  Estimate that frac and pipeline to well will be completed and well on production by June 15.

5/19/2006  Drilling about 2,500' into Georgetown lateral, with good flares and oil shows.  Expect to finish lateral by end of weekend.

5/16/2006  Finished Buda lateral, and inserted slotted liner in lateral well bore.

5/10/2006  Drilling at 3200' of first (Buda) lateral, with god flares and substantial oil in returns.

5/4/2006 Drilling at 500' into first lateral, had 10-15' flares and oil in the mud pits.

5/3/2006 Finished drilling curve and are 150' into first lateral.

4/27/2006 Drilling at 7,451'

4/17/2006 Rigging up full scale drilling rig to drill vertical well bore.

3/29/2006  Well bore initiated and surface casing set.

 

Copyright B&R Energy LLC